Skip To Main Content

Ambrose

Ambrose Family Center

We will:
Improve
• Accessibility and safety on playscape
• slip-resistant flooring in classrooms
• Camera servers

Replace
•Electrical supply equipment
• Exterior and interior doors
• Inefficient fixtures
• All air-conditioning units
• Retaining walls

Install
• Additional card readers and lockdown capability
• Additional exterior lighting
• Wayfinding signage


Elementary Schools & Hixson Middle School
• Improve/ replace electrical systems
• Replace interior and exterior doors
• Improve interior finishes
• Improve masonry
• Update mechanical systems
• Improve outdoor accessibility
• Improve/ replace pavement and retaining walls • Improve/ replace roofs, gutters and eaves
• Improve safety and security
• Provide fire suppression & ventilation for FACS classroom (Hixson only)
• Provide additional exterior lighting
• Improve water infiltration mitigation
• Replace windows 

WGHS
Provide:
• Fire suppression & ventilation for FACS classroom
• Additional exterior lighting
• Asbestos abatement
• Masonry repairs and tuck-pointing
• HVAC system and electrical safety updates
• Grading of Selma Field
• Pavement drainage systems in parking lots
• Upgraded camera system
Replace
• FACS classroom cabinets & countertops
• Interior and exterior doors
• Windows
• Walk-In freezer
• Wayfinding signage

Moss Field
Provide
• ADA compliant entries, restrooms & seating
• Concession stand improvements
• Expanded restrooms
• Locker rooms and fitness classroom
Replace
• Existing parking lot and drive lanes
Install
• New bleachers and pressbox
• Energy efficient LED lighting that also reduces light pollution to neighborhood

Synthetic turf field
• 8 - lane track
• Alarm and surveillance systems